Streamview变电站
重建 & 扩建工程 

图像
Streamview变电站

概述

我们的使命是提供我们的3.为700万客户提供清洁、安全、可靠的能源. 要做到这一点, we continue to modernize and upgrade existing substations and infrastructure so our 客户 get the reliable energy they deserve. We started work on the Streamview变电站 重建 and 扩建工程 November 2022. 一旦完成, it will improve reliability and the integrity of our electric system for communities in the mid-city San Diego area. These communities have experienced sizeable growth in the past decade and are forecast to grow even more over the next ten years. Additional residents and businesses mean a greater demand on existing power lines.

德尔玛项目项目效益

项目的好处

  • Improves reliability of the electric transmission and distribution systems
  • Enhances safety by upgrading the existing 1950s aging infrastructure
  • 有助于防止可持续发展目标中的意外中断&E的服务区域 
  • 适应未来的负荷增长

项目简介

The Streamview变电站 is in the Chollas View/College area within San Diego. 所有升级都将在现有可持续发展目标的基础上进行&现有通行权范围内的财产. 该项目将重建和扩展可持续发展目标&E’s existing 69/12kV Streamview变电站 to better meet current engineering standards and improve reliability. The project also includes upgrades to existing overhead transmission and underground distribution lines that extend beyond the Streamview变电站 site.

图像
项目简介

项目进度

建设 - 2022年第四季度至2026年第四季度

在职日期 – Q4 2026

277.75 KB
PDF
下载Streamview变电站重建 & 扩建工程便览
下载Streamview变电站重建 & 扩建工程便览
图像
期待什么

期待什么

预计交通延误和临时车道关闭. 西班牙&E plans to have traffic control measures in place during construction and our crews will strive to minimize any impacts to you and your neighbors. 建设 activities at this location may occur intermittently. 工作时间, traffic control measures and 噪音 restrictions for each area are established by local jurisdictions.

项目地图

流景项目图

 

施工通知及最新情况

252.10 KB
PDF
2022.11.18 Streamview变电站 Distribution Pre-建设 Letter
2022.11.18 Streamview变电站 Distribution Pre-建设 Letter
221.94 KB
PDF
2022.7.20 Streamview变电站 Demo 建设 Notification Letter
2022.7.20 Streamview变电站 Demo 建设 Notification Letter

常见问题

查看下面的项目常见问题解答或下载PDF 在这里.

This project will replace aging electric service equipment and improve the safety and reliability of electric transmission and distribution systems for the Chollas View and College areas of 圣地亚哥市.

项目范围包括:

  • 取代上世纪50年代安装的老化基础设施
  • 升级架空输电线路 & 现有地下配电线路
  • Enhancing safety upgrades to help prevent unplanned outages in 西班牙&E的服务区域
  • Providing additional capacity to serve existing and future electrical load growth.

随着我们地区的扩张,对能源的需求也在增长. Given the load growth over the past decade in the mid-city San Diego area, increased demand for energy has created congestion on the existing power lines which causes a strain on the electric system. The substation expansion will provide additional capacity and system reliability for the area.

The project is located on a triangular piece of land bounded by Lea Street to the north, 54th Street to the west and Chollas Parkway to the southeast in 圣地亚哥市 Chollas View and College areas. 该项目包括可持续发展目标的建设活动&E’s existing Streamview变电站 which includes newly acquired parcels that are adjacent to the existing site.

The community is made up of mixed residential and commercial districts. Some major 客户 in this area include San Diego State University, 圣地亚哥市, 统一学区, AT&T, Verizon, T- mobile和救世军.

A laydown yard (also called a staging area) is a location typically near a construction site w在这里 tools, 材料, equipment and vehicles are stored temporarily when they are not in use. The laydown yard for this project is located east of the Burlington Department Store and south of University Avenue. It is desirable for the laydown yard to be in close proximity to the active construction site to minimize impact on traffic, 噪音, 等. 为社区服务. Access to and from this location will occur from Chollas Parkway.

会有断断续续的噪音, 然而, work will be performed in compliance with 圣地亚哥市 噪音 ordinance. While the ordinance allows for work to be performed from 7 a.m. 到晚上7点.m., Monday through Saturday, most of the work will be performed approximately between 7 a.m. 和4p.m.星期一至星期五. Crews will not perform work on holidays or Sundays except under extreme or emergency conditions.

预计建设将于2026年第四季度结束.

总的来说,对周围交通的影响将是最小的. T在这里 will be times when our trucks and equipment are coming and going from the substation which may cause some traffic. 除了, 偶尔会有肩部闭合, lane closure or manned traffic control to complete portions of the work. Work that could impact traffic and the public will be performed in accordance with traffic control and other permits issued and monitored by 圣地亚哥市.

西班牙&E的首要任务是安全. This project is no different from many other electric infrastructure upgrades and projects 西班牙&E®承担整个地区. All infrastructure within the transmission and distribution systems is designed, 构造, operated and maintained in accordance with strict state and federal safety regulations.

西班牙&E has a comprehensive and proactive safety program to ensure the integrity of the system and the protection of our communities, 客户, 员工和基础设施.

你可浏览我们的 ucto-dane.net/Major-Projects 欲了解更多信息或拨打项目信息热线 1-844-765-6388.

更多的信息

如有疑问,请致电 项目信息专线 at 1-844-765-6388.